Use the Calculator to explore directional Compute Yield assumptions for your fleet. Results are planning estimates, not measured production gains.
Definitions
Related measures, but not interchangeable.
Throughput improvement, energy reduction, wall-clock reduction and structural-waste recovery are distinct metrics. Results from separate configurations are never combined into one claim.
Quality
Quality-equivalent
Same model and weights, agreed quality standard, service level and acceptance criteria.
Waste
Structural waste
Work that does not contribute proportionately to accepted output.
Yield
Compute Yield
Quality-equivalent accepted output per GPU-hour, joule and infrastructure dollar, measured after controller overhead.
A screening estimate is not a measured result. Published measurements identify the relevant hardware, model, workload, baseline and configuration.
— Calculator interpretation standard
Inference waste calculator
Simulation / planning model
Estimate directional inference capacity before buying more hardware.
Adjust the assumptions to model the possible magnitude of recoverable capacity across an existing inference fleet. Results are planning estimates, not guaranteed savings.
Economic and Technical use different assumptions. Economic estimates planning value; Technical estimates workload fit and proof posture. Compare directionally, not one-to-one.
Modeled annual opportunity$2.34M
Capacity value $2.23M + energy $102.5K
Planning estimate only. Actual results require workload-specific testing. Token-cost savings are shown separately to help avoid double-counting.
Recovered GPUs100
Capacity effect1.10×Based on selected assumptions
Cost / 1M tokens$9.38
Modeled recovered GPU-equivalent capacity100 GPUs
Capacity-equivalent estimate: approximately 1,100 GPUs at this recovery scenario.
ModeledRecovered GPU-hours / year744,600
Modeled GPU-hours available for additional throughput or capacity deferral.
ModeledRecovered capacity value$2.23M
Annual value using the selected GPU-hour economics.
Planning valueIllustrative capex deferral$4.00M
Illustrative procurement deferral if recovered capacity substitutes for incremental demand.
IllustrativeModeled energy opportunity$102.5K
1,139 MWh-equivalent annual opportunity if recovery reduces power proportionally.
ModeledToken-cost lens$104.2K
Token-cost lens: this scenario implies a cost-equivalent shift from $10.42 to $9.38 per 1M tokens before overhead validation.
Lens only
This calculator is for planning purposes. Actual results depend on workload-specific baseline-versus-controlled testing, quality gates, overhead accounting, and hardware-counter review. For budgeting, use one primary economic lens at a time — capacity, capex, energy, or token cost — to avoid double-counting.
Technical calculator
No finance inputs
Estimate technical inference waste without financial assumptions.
This technical calculator uses the newer proof-stance model for workload screening. It intentionally avoids economic outputs so it does not conflict with the original economic calculator.
The technical lens applies a conversion haircut before turning recoverable work into useful throughput.
Energy per outputfleet power / fleet-wide throughput
Energy per 1K tokens uses total fleet power and fleet-wide throughput, not only per-GPU power.
Lens separationEconomic ≠ Technical one-to-one
Economic estimates planning value. Technical estimates workload fit and proof posture. Compare directionally.
Screening confidenceweighted blend of quality retention, low overhead, conversion efficiency, and waste-signal strength, with a +20 baseline reflecting screening-not-proof scope.
This is a directional confidence score for a screening tool. It is not a measurement of expected production accuracy. Counter-validated benchmarks would replace this score before any external claim.
Next step
See Waveform against your own baseline.
Share your infrastructure environment, selected workload and operating objective. Vectris will define the evidence required for a customer-specific Compute Yield case.